Prefinished CLT Panels


For our recent project in Wyoming, Red Falls Timber delivered kits to a pair of spec homes. Each property was a 2500 sq ft main residence with a separated 1200 sq ft  ADU (Additional Dwelling Unit).  The area is extremely "labor constrained"- that is to say, there aren't enough people to do the work that needs to be done- so Red Falls Timber had our elements pre-coated with a finish in the factory.

The results were excellent. The finish kept the timber from yellowing from UV exposure during assembly, it made them easy to clean, and reduced the man hours required before the homes went on the market.  Adding value offsite always pays off.


Red Falls Timber Co. is proud to provide predictable results to our clients. 
 